Overview
Full refurbishment of a substantial Knightsbridge apartment as part of a wider scope of redevelopment and renovation expertly designed by Staffan Tollgård Design Group.
Challenges
To supply our usual high standard of quality on made-to-order hardware including bespoke items and special finishes, whilst achieving tight lead times for first fix hardware, and seemingly impossibly tight lead times for additional cabinet hardware.Result
The result:
A visually striking, yet calm and luxurious apartment, with a sense of open space and a rich variety of beautifully blended textures and finishes.
Those involved:
Interior Designer, Contractor.
Scope:
Door and cabinet hardware.
Additional services:
Standard lead times halved on additional extras.
Regular production updates provided to both client and contractor.
Flush pulls to a variety of special measurements.
Special RAL colouring of flush pulls exactly to client requirements.
Non-standard lever and rose combination, including matching accessories.
Bronze finish on all Banham Hardware matched to other hardware, with external doors co-ordinated in a split Bronze/Polished Brass finish.